Standard Work Type 3-Based Work Time Measurement and Workload Balancing Analysis Using Yamazumi Chart

  • Ari Andriyas Puji Department of Mechanical Engineering, Universitas Riau, Pekanbaru, Indonesia
  • Indro Prakoso Department of Industrial Engineering, Faculty of Engineering, Universitas Jenderal Soedirman, Purwokerto, Indonesia
  • Muhamad Fauzan Arridho Department of Industrial Engineering, Faculty of Engineering, Universitas Jenderal Soedirman, Purwokerto, Indonesia
DOI: http://dx.doi.org/10.36842/jomase.v70i2.636
Abstract views: 0 ,   pdf downloads: 0
 

Abstract

Load imbalances among Material Handling (MH) operators in the automotive manufacturing industry may result in overload or idle conditions, thereby disrupting material supply and delivery accuracy. This study measured the cycle of time standard of MH activities using the Standardized Work Type 3 (SW Type 3) method, analyses workload distribution through Workload Analysis and the Yamazumi Chart, and designs a feasible workload-balancing scenario for automotive component manufacturing companies. Data were collected via time studies with five repetitions per activity in the Finished Goods (FG), Delivery, and Brake Assembly/Drum in Hat (BA/DIH) areas. Results indicated that the FG area was overloaded, with utilization rates of 115.7–120.0% of the available 480 minutes per shift. The Delivery area experienced critical overload, with utilization rates ranging from 177.0% to 207.8%. In contrast, the BA/DIH area exhibited a maximum workload gap of 70.9 minutes per shift, despite all operators remaining below the available time. The job-balancing scenario, implemented through the redistribution of Supply Empty Box activities, reduced the workload gap among operators by 72.2%, ensuring all operators remained within their available time.

##Keywords:## Balancing Job, Material Handling, Standardized Work Type 3, Workload Analysis, Yamazumi Chart.

Downloads

Download data is not yet available.
Published
Jul 30, 2026
How to Cite
PUJI, Ari Andriyas; PRAKOSO, Indro; ARRIDHO, Muhamad Fauzan. Standard Work Type 3-Based Work Time Measurement and Workload Balancing Analysis Using Yamazumi Chart. Journal of Ocean, Mechanical and Aerospace -science and engineering-, [S.l.], v. 70, n. 2, p. 171-176, july 2026. ISSN 2527-6085. Available at: <https://www.isomase.org/Journals/index.php/jomase/article/view/636>. Date accessed: 01 sep. 2026. doi: http://dx.doi.org/10.36842/jomase.v70i2.636.

References

[1] Gaikindo. (2024). Data penjualan dan produksi kendaraan bermotor. Gabungan Industri Kendaraan Bermotor Indonesia. https://www.gaikindo.or.id. Accessed: 10 May 2024.
[2] Tompkins, J.A., White, J.A., Bozer, Y.A. & Tanchoco, J.M.A. (2010). Facilities Planning. 4th ed. John Wiley & Sons.
[3] Farhana, D.H. (2020). Analisis beban kerja dalam menentukan jumlah tenaga kerja optimal dengan metode workload analysis di PT Jaya Teknik Indonesia. Scientific Journal of Industrial Engineering, 18–22.
[4] Sabadka, D., Molnár, V., Fedorko, G. & Jachowicz, T. (2017). Optimization of production processes using the Yamazumi method. Advances in Science and Technology Research Journal, 11(4), 175–182.
[5] Chan, C.O., Lau, H. & Fan, Y. (2023). The role of Yamazumi chart in lean standardisation: Modelling and analysis using performance loss function. International Journal of Productivity and Quality Management, 38(4), 435–463.
[6] Suherman, A., Ningsih, Y.T. & Handayani, S. (2025). Analysis of employee workload using the workload analysis (WLA) method. SITEKIN Journal Sains, Teknologi dan Industri, 23(1), 1–8.
[7] Islam, M.S. & Ahmed, S. (2024). Work standardization in lean manufacturing for improving production line performance. Malaysian Journal of Composites Science and Manufacturing, 13(1), 68–81.
[8] Baroto, T. (2002). Perencanaan dan Pengendalian Produksi. Ghalia Indonesia..
[9] Ariyanti, S., Azhar, M.R. & Lubis, M.S.Y. (2020). Assembly line balancing with the Yamazumi method. In IOP Conference Series: Materials Science and Engineering (Vol. 1007, No. 1, p. 012078). IOP Publishing. doi:10.1088/1757-899X/1007/1/012078.
[10] Chan, C.O., Lau, H. & Fan, Y. (2023). The role of Yamazumi chart in lean standardisation: Modelling and analysis using performance loss function. International Journal of Productivity and Quality Management, 38(4), 435–463.
[11] Fedtke, S., Boysen, N. & Schumacher, P. (2023). In-line kitting for part feeding of assembly lines: Workload balancing and storage assignment to reduce workers’ walking effort. OR Spectrum, 45(3), 717–758.
[12] Abdous, M.-A., Delorme, X., Battini, D. & Sgarbossa, R. (2025). Scenario-based optimization and simulation framework for human-centered assembly line balancing. International Journal of Production Economics, 282, 109513.
[13] Ahmadi, T. & Rahmani, N. (2024). How to develop standardized work for business processes in the transactional office environment. Total Quality Management & Business Excellence, 35.
[14] Mortada, A. & Soulhi, A. (2023). Improvement of assembly line efficiency by using lean manufacturing tools and line balancing techniques. Advances in Science and Technology Research Journal, 17(4), 89–109.
[15] Zennaro, I., Finco, S., Battini, D. & Persona, A. (2019). Big size highly customised product manufacturing systems: a literature review and future research agenda. International Journal of Production Research, 57(15-16), 5362-5385.
[16] Pilati, F., Lelli, G., Regattieri, A. & Ferrari, E. (2022). Assembly line balancing and activity scheduling for customised products manufacturing. The International Journal of Advanced Manufacturing Technology, 120(5), 3925-3946.
[17] Hashemi-Petroodi, S. E., Dolgui, A., Kovalev, S., Kovalyov, M. Y. & Thevenin, S. (2021). Workforce reconfiguration strategies in manufacturing systems: a state of the art. International Journal of Production Research, 59(22), 6721-6744.