The experiment was carried out using chain-wire ropes as shown figures below.

Figure.1: Chain-wire rope mooring lines installed on rounded-shape FPSO (taken by Koto).

Figure.2: Chain-wire rope mooring lines installed on the rounded-shape FPSO in the middle of the marine dynamic basin tank (taken by Koto).