Joint International Research Center
-Offshore Engineering- |
Depositioning of Shuttle Tanker during Loading and Offloading in Tandem arrangement
Position of the shuttle tanker during loading and offloading in tandem arrangement was studied.

Figure.1: 45 degree of a shuttle tanker behind the Rounded-Shape FPSO in Tandem arrangement at 1.6 sec of wave periods (taken by Koto).

Figure.2: Parallel position of the shuttle tanker behind the Rounded-Shape FPSO in Tandem arrangement at 1.6 sec of wave periods (taken by Koto).